Address - 100 E Chemung Street, Painted Post, NY 14870
Tentative Start Date - 29th and 30th April 2026. Confirmed date to be provided closer to hardware arrival.
Timings - 8 AM to 5 AM local time (8 hours)
Number of days - 2
Activities
Rack Build & Preparation
• Equipment to be unpacked and installed in the racks
• In rack cabling (power and data) to be connected
• All equipment will be clearly labelled at both the front and rear
• All cables will be labelled at both ends
Connectivity & Testing
• Cluster switches will be connected to on-site switches
• Testing will be carried out collaboratively with the customer based on an agreed test plan
• Failover and maintenance procedures will be validated