Rate:100-150 euros per day
Physical Site survey
- Validation / Verification of existence asset inventory data what Infosys has received from Siemens/Atos
- Verification of other devices (endpoints, i.e. PPDM etc..)
- Verification of AP’s and exact location including the hight from the floor.
Wireless Survey:
- Verification and capture the existing signal strength along with coverage area with bandwidth utilization. Track pre and post performances
End Point Readiness:
- All endpoints, such as PPMD devices, IP phones, etc., are already uploaded into ITAM. These may cause issues during cutovers if we don’t have a track
Spare and Decommissioned devices :
- All endpoints, such as PPMD devices, IP phones, etc., are already uploaded into ITAM. These may cause issues during cutovers if we don’t have a track